The enclosure of Site-96 is to be monitored frequently for signs of breach. All personnel accessing the site must undergo thoroughreview and display a current authorization permit. In the event of an incident, predetermined protocols are to be executed immediately. Site-96's backup containment systems are designed for use in the unlikely occurrence
End-of-Operation Record
All operations related to the termination of Site-96 have been successfully completed. The following report outlines the results of the procedure. Staff were removed from the site immediately following the triggering of the shutdown sequence. A complete assessment of the site revealed negligible collateral damage. Further investigation is necess